October 2002

In October the cork was laid and the trackwork was laid in the staging yard. This is the easier track as the switches are “Out of the box”. Despite the Merseyside Club exhibition at the end of October, the trackwork was continued round the front to provide running lines for the Open Day on 24th November. This will be replaced when the hand-built switches are ready. The locations for the buildings were provisionally mapped out.