December 2008

Chris suprised us at one of the Christmas open evenings in December by bringing down the nearly complete Freight House. Shows what retirement, lots of time, care and just a bit of skill can produce – it’s looking very good!

November 2008

We continued modelling in the Autumn (Fall), still continuing with completing buildings and with Paul re-wheeling freight cars, building coal hoppers and putting coal in them. I’ve not managed to do a separate Q3 page because of the Model Railway Society exhibition at the end of October – but this was my last year as manager so should be able to do one next year (?!?).

Chris made good use of the etched brass lintels and doors in building the freight house. These photos show the very early stages of construction. Construction is in plasticard – mainly from Slaters. The next three photos show the painted fire escape (built by Paul) on the Hooven Building, Dave’s frame of the Susquehanna Street petrol (gas) station and Chris’s station building.

Paul is quietly building the Central Hotel at home (he is a first class modeller – see the Woodside page) and brought it in for the club open day. We sneaked a picture of it while he wasn’t looking. Steve has now “finished” the last building on Susquehanna Street (almost – Chris is going to build the still card outline building just visible in wood). We are going to have a finishing off session (or several) in the New Year to finish the details, the shop contents and then paint them all together.

The final three photos show the model at the Open Day at the end of November.

Quarter 2 2008

We continued modelling in the early Summer, continuing with completing buildings. Paul is still re-wheeling box cars and has managed to get our 4-8-0 running smoothly and is now working on the more recalcitrant locomotives.

Steve has pretty well completed the next building on Susquehanna Street making good use of the brass etched windows and has now started on the last – the end is in site.

Steve used brass etching to prepare all the windows, doors and archways for the Freight house which Chris has moved on to having completed the Station. Some additional architectural details were also etched for use to detail the other Susquehanna Street buildings.

When not working on the station, Chris has been carving the war memorial. He has now finished this (note the statue was modified from a plastic one) but with the statue facing slightly towards the front of the model – artistic licence!

Quarter 1 2008

We continued modelling in the Spring, focusing on completing buildings. Paul started work on the Central Hotel but owing to a confusion with drawings, the first version was slightly overscale. Despite this delay he has now made a start on the correctly scaled building (note: this was Steve’s fault!). He also continues rewheeling trucks and is now working on the more recalcitrant locomotives.

Steve has continued adding to the last six buildings on Susquehanna street, completing the building started by Alisdair and fixing all six to perspex bases. This last is so that they can be removed in transit as some sit over baseboard joints. O-scale paving slabs were individually cut and mounted (see 1st picture) to give a fairly good representation of the paving slabs seen in photos of the period.

Steve also experimented with Brass etching to prepare a revised set of windows for the Iron Works and used the spare space to make sash windows for the next Susquehanna street block of apartments. The Iron works certainly looks a lot better.

When not working on the station, Chris has been carving the war memorial based on a set of scaled photos – both period and current. In the photo (L) Ian is working behind Chris.

Chris carried on with the Station building adding the roofing beams and then the roof. Getting the line of the roof over the change of direction of the platform awning proved a challenge! The roof was initially painted for the current roofing colors, but will be repainted grey soon to match the roofing of the late 40s.

Chris and Steve bought BLI Mikados on eBay with the intention of modifying them to M3s. To their surprise and delight, both have sound chips and the result is far more pleasing to the ear than the F3A and B purchased last autumn.

The station was placed on the layout for the Spring Open Day in early April and really added a lot to the overall impression. I think we are beginning to see how the final layout might look, although still a long way to go.

To our great pleasure, Dave Williams joined the group in February (photo left). He was a club member many years ago and is again starting up with the hobby as he has now retired (and done the obligatory DIY at home!). Welcome Dave. He is working up to modelling the petrol station and associated buildings on the front side of Susquehanna Street.