Category Archives: 2009

Quarter 4 2009 – trees!

In all honesty Q4 hasn’t been marvellous for modelling although much work has gone into getting locomotives running smoothly. Much of this is down to our usual autumn exhibition. However, in the last update we promised trees and trees there have been. Here are some photos of the woodland that has suddenly grown at the left hand (Southern) end of the layout. In the next update I’ll do a report on how we make the trees. Enjoy.. and happy new year.

Quarters 2&3 2009

p-2009-09-019We seem to have slowed down again over the summer due, I suppose, to other commitments, but also to much activity focused on ‘slow’ areas. In particular, Paul has been devoting nearly all his time to setting up DCC and chipping locos and then trying to get them to run – the brass ones are particularly difficult. We went for the NCE DCC kit in the end which seems to do everything we want. We are also using basic Hornby chips which do the job, although some locos came with sound chips ready installed. The best bit about DCC for me (old misery) is that we can turn the sound off the sound chips!

In the summer, Dennis Morley, an O-Gauge modeller, delivered the brass locos back after painting – he’s done an excellent job. Weathering still to be done. Here are three of them, the 4-8-0 was finished later.

Steve spent most of the past six months doing shop interiors using various materials from Langley Models (UK, 4mm to the foot but manageable) and Preiser (right scale but not cheap!). He also made good use of the colour printer and photos of old shops that he’d been accumulating. Three examples are shown here, but you can’t really see very much once they’re in.

To finish them off Steve’s been using computer written signs and scanned and reduced posters. Home made decals have also been employed with extensive use of various free and not-so-free software. The signs and buildings still need a fair bit of weathering but it’s getting there. Susquehanna Street is pretty much done now, except the sidewalks and ashphalt.

Chris has finished the detailing on the freight house and only the weathering of the roof remains. Dave has finished the gas station on Susquehanna Street, again awaiting only weathering.

And to finish off a few extra photos from our last open evening. We’re counting down to the Exhibition at the end of October now – Pete Waterman is opening it (you’ve either heard of him or you haven’t). Trees next…

Quarter 1 2009

p-2009-03-012p-2009-03-010We have really sped up our modelling since the new year, mainly as a result of a number of all day sessions. It feels as though we have nearly completed the buildings now and have moved on to weathering rolling stock (initially coal hoppers). There is now a definite plan to take Mauch Chunk to our exhibition in the fall (end October 2010) so we have a deadline – help!

So firstly Chris has pretty much finished the Freight house – which is now my favorite building on the layout. Here it is under construction and in its finished form on the layout.

Secondly, Paul has finished the Central Hotel with only the Hotel Switzerland’s back and sides to do now. In the picture he is making an RS3 work again (how? haven’t a clue!). He also fixes the trackwork and wheels when stock doesn’t run smoothly (i.e. falls off) – also a mystery

Steve Rogers, from the Leigh Model Railway Club, has been joining us for modelling sessions and painted the roof of Chris’s Station Building. He has also finished off another cliff face, most of which will sadly be hidden by the buildings on Susquehanna Street. Chris has also been working on Paul and Steve’s Hotel and Iron Works respectively to get a consistent brick finish (below).

Dave has worked manfully on with the gas station and associated buildings on Susquehanna Street, which should be finished soon now. Steve (Hales) has painted and weathered the buildings on Susquehanna Street. Still work to do with blinds and interiors, but it’s coming along.

Steve has also had a go at weathering the coal hoppers on the layout using weathering powders (mostly Carr’s).

All the remaining photos below (nearly all) were taken at the Spring Open Day in mid April. Some have a temporary backscene put up during the Open Day, which gives a much different feel. The old-style cabooses were built for us by Bill (Rails2) after a contact through eBay – beautiful.