track!

In the week before Christmas and New Year the turnouts and tracklaying were completed by Richard and Mike. Once down only 14 feet of original track remained!  The ‘dropper’ holes (new and old) were filled with tissue paperby Steve to prevent ballast loss and the whole was airbrushed black by Mike.

Gareth (shown) and Steve then painted the sides of the track a rusty brown – avoiding any switch blades. Finally Steve ballasted the track (with help from Gareth) using real sieved coal from his coal scuttle.