December progress

Running up to Christmas we have carried on at great pace to finish the trackwork and scenic work on Mauch Chunk.

Richard has carried on turnout building and, having finished 12 (?) turnouts – many in groups – is now relaying the track on the front to accomodate them. This has produced a pile of old turnouts which have served us well for many years but are not reliable enough for the new exhibition running. Mike is also lending a hand with tracklaying.

Mike has carried on with the smoothing of the roadways, which currently look very smooth – a bit of weathering will make them more realistic.

Gavin has built the new backscene boards using 3mm ply and braced them with 1inch x 1inch timber (not shown). He has also varnished and primed them for Steve to paint.

Steve has carried on with weathering the walls and rockface and then moved on to ballasting the RH end of the layout and adding the rocks on the river edge. Ground cover has also been added to the hillsides with Woodland Scenics coarse and fine scatter in several colours and blends, prior to re-adding the trees.

The late Chris Bennet’s bridge (the earlier girder bridge) has been extended using the same techniques and and pieces to extend over the extra tracks.