April 2003

Chris has been reshaping Mount Pisgah as it abuts onto route 209, introducing more polystyrene shavings! Steve has started to lay sidewalk from 3mm MDF in Susquehanna Street. Ian and Chris have used brick plasticard on the river wall and Ian has added the capping stones to the wall at the side of route 209. Finally Paul has started to permanently lay and wire the staging-yard track.

Photos include Ian cutting capping stones from plastistrip and glueing them along the top of the retaining wall