June 2003

Here’s the progress in May and June together, as May was rather slow. Paul carried on cutting holes for switch motors and wiring the switches in the storage yard, and has now completed it. Steve carried on laying sidewalk and Ian carved a tunnel mouth, required to get the track off the LH end. Chris and Steve cut away some of the riverside wall as in the prototype and Chris planned out the bridge and built the buttresses. Chris (with Paul’s help) spent most of May and June building lighting gantries for the club layouts. Steve has been building the first store on Susquehanna St. from plasticard on a perspex frame. This will be the subject of a separate article shortly (it looks better in the pictures than in real life!).