May 2011

A lot of detailing work was done in early 2011: grass along the lineside using static grass, lineside fencing and some of the more ‘interesting’ telegraph poles that overhang the river! Additional foliage was also added in various places.

An attempt was made to provide some waves on the river to stop it being mistaken for a lake or a mill poind – sadly this failed. Whether this was operator incompetence or poor material we don’t know. The river was taken back to the base and reworked up to its previous shininess.