Tag Archives: wiring

Quarter 2 2004

Progress has slowed a little this quarter – mainly as Chris has been focusing on building replacement lighting gantries for taking club layouts to exhibitions. However, Paul has plodded on with the wiring, and has now finished his sixth board (all in the storage yard) – the wiring really is beautiful if you like that sort of thing. As I write he has started on the front boards. Steve has been doing some scenic modelling on the front wall and making a lot of noise carving stones out of plaster with his mini-drill. The photos show all this:

Photos include: Firstly Paul and the rewiring – by early June, all the four rear baseboards and the end boards had been wired and tests have ensured that trains will run. In early June, all the baseboards were re-assembled and the layout looked quite good. Paul started on the wiring of the front boards later in June. Steve worked on the wall along the Lehigh river – more details can be found on a project page – the river wall.

March 2004

Progress also continued well in February and March. Chris put finishing touches to the turnouts and trackwork on the front of the layout and Paul removed, wired and replaced two baseboards as he starts the laborious task of wiring the layout. Although we will use DCC eventually, he is wiring for standard operation at the start with four blocks. Chris has also built and placed a model weighscale (see archive photo #707).

Photos include: The wiring (I didn’t get the exciting photos of Paul actually doing it) is, as usual, quite inspiring! Chris starting on the finishing touches at the baseboard joints, and an open view of the layout without the backboard – removed so that baseboards can be taken out and wired. The (non-functioning) weighscale built by Chris (see photo #707)and a caboose under construction by Steve.