Category Archives: Chiltern MRA 2018

Chiltern MRA 2018

Chiltern MRA – 13th/14th January 2018 – Stevenage Arts & Leisure Centre, Lytton Way, Stevenage SG1 1LZ

We prepared the layout for this exhibition right up to the night before and beyond. All the pointwork has been rebuilt on the scenic section and all the track except 14 feet relaid. Much of the scenery has also been reworked and has been extended round the curve at the right hand end, as has the fascia – see the progress pages for more details.

Most notably, Richard finished the signal gantry built from a custom etch and on the Friday night he and Gavin got its 3-position semaphore working. We again used Big Bear and TeamViewer to control the layout from two laptops and introduced a tablet for additional control.

Once a few pointmotor niggles had been sorted in the fiddle yard, the layout ran exceptionally smoothly over the new track. We had a guest operator from the NMRA on the Sunday and he was most impressed. The crowd was good, especially on the Saturday, and reflected the very high quality of the show.

Again, steam power – mainly brass – was to the fore, as were brass double enders and babyfaces. There was particular interest in the camelbacks after the recent article in the January Continental Modeller.

Mauch Chunk showed its potential and was enjoyable to operate. The exhibition team was Steve Hales, Richard Oldfield, Gavin Liddiard, Mike Rapson, Kevin Bays and Philip Sutton. Gareth Evans also helped out.

Claude Doussot took a video which he has kindly allowed us to post on YouTube :

The photos show us packing the van and putting up the layout, as well as operating it and the fiddle yard – and of course lots of photos of the scenic section!